EasyManuals Logo

BBA Pumps BA Series User Manual

BBA Pumps BA Series
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
BA series pumps
Receiving, transport and storage 1401
4.6
4.7 Storage longer than 6-12 months
For storage longer than 6-12 months, take the following measures:
1. Apply a layer of preservation agent to all unpainted parts and rotating parts.
2. Seal the suction flange liquid-tight.
3. Seal the connection for flushing, circulation or cooling (if present).
Note
The type of preservation agent to be used depends on the materials and the application.
Consult BBA Pumps for the correct preservation agent.
4. Fill the pump with preservation agent.
5. Slowly rotate the driveshaft one revolution by hand.
6. Seal the pressure flange liquid-tight.
WARNING
The pump units may be stacked for storage purposes. Do not stack pump units
more than two high.
4.8 Inspection during storage
1. Make sure the pump units are not stacked more than two high (if applicable).
2. Check the level of the preservation agent once every three months. Top off the preservation agent
if necessary.
3. Slowly rotate the driveshaft one revolution by hand.
4.9 Transport of pump with preservation agent
Prior to transport, check the pump for leakage of preservation agent.
WARNING
Leakage of preservation agent can cause the floor to become dangerously slippery
and may lead to preservation agent entering the environment.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BBA Pumps BA Series and is the answer not in the manual?

BBA Pumps BA Series Specifications

General IconGeneral
BrandBBA Pumps
ModelBA Series
CategoryWater Pump
LanguageEnglish

Related product manuals