EasyManua.ls Logo

BD PrepMate Automated Accessory - Loading;Unloading the Specimen Rack

BD PrepMate Automated Accessory
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BD PrepMate™ Instrument User’s Manual
16
5.1 Loading/Unloading the specimen rack
1 Confirm that the specimen vials and centrifuge tubes are properly accessioned (labeled).
Vortex the vials.
2 Inser
t the specimen vials to be processed into the specimen rack starting at vial row 1 (see
Figure 5). Fill each row of 4 in order until the rack
is full (12 vials), or until all of the vials to be
processed are loaded. Make sure that the vials ar
e fully seated in their circular wells. If
processing fewer than three rows of vials, start loading vials at vial row 1.
Syringe, vial, &
tube row 1
Centrifuge rack
row 1
Figure 5 – Loading the specimen rack
3 Lo
ad the centrifuge tubes into the specimen rack. Insert each tube adjacent to its specimen
vial, and then pipette 4 mL of BD Density Reagent into each tube.
4 mL density
reagent
Figure 6 – Centrifuge tubes loaded into specimen rack

Related product manuals