BHT-206L4-MM-1
5-00-00
ECCN EAR99
3. Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206L4-FM-1 4. Start the helicopter and conduct ground run at 100% N
R
to
check for leaks and ensure all systems are operational and
parameters are within Flight Manual limitations.
Chapter 96 5. Check the voltage regulator setting. Adjust as required.
5-25. 300-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 5 (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
25 FEB 2011 Rev. 13 Page 75/76