BHT-429-MPI
ScheduledInspections-8000-HourInspection
Table1.ScheduledInspections-8000-HourInspection
INITIAL
DATAREFERENCE/IMRR
TASKNUMBER
TASKDESCRIPTIONACCESSZONES
MECHOTHER
DATE:__________________W.O.
FACILITY:
HELICOPTERS/N:
REGISTRYNO.:
TOTALTIME:
SIGNATURE:
NOTE
Tobeperformedevery8000hoursofoperat-
ingtime.
GENERAL
1.Reviewhelicopterlogbookandensureall
recordeddiscrepancieshavebeencorrected.
2.Ensurecompliancewithallapplicable
airworthinessdirectives.
429-A-04-00-00-00A-009A-A
3.Ensurelifelimitedpartsdonotexceedservice
life.
429-MM,Chapter12
4.Ensureallrequiredlubricationtaskshavebeen
performed.
429-A-05-40-00-22A-281A-A
5.Ensureallrequiredmiscellaneousinspections
havebeenperformed,asapplicable.
429-MM,Chapter99
6.Ensureallrequiredinspectionsofinstalled
BHTkitsnotcoveredinthisinspectionhavebeen
performed,asapplicable.
7.Recordaccomplishmentofthisinspectioninthe
helicopterlogbook.
PREPARATIONTASKS
1.Removepanels100DL,200AL,200AR,200F ,
and400B.
DCPOWERSYSTEM
429-MM,Chapter96
246003
1.Doanoperationalcheckofthenon-essentialbus
feederdiodes(2430CR2and2430CR3).
200AL,
200AR,
200F
216
429-MM,Chapter96
246002
2.Doanoperationalcheckoftheemergencybus
feederdiodes(2450CR1and2450CR2).
200AL,
200AR,
200F
111
429-MM,Chapter96
246005
3.Discardthebusinterconnectdisablerelay
(2430K7).
100DL111
429-MM,Chapter96
243001
4.DoafunctionalcheckofGRCUs(2430VR1and
2430VR2).
400B410
COMPLETIONTASKS
1.Installpanels100DL,200AL,200AR,200F,and
400B.
Applicableto:ALL429-A-05-40-00-18A-281A-A
ECCNEAR99
10JAN2019-Issue1Page1