BHT-429-MPI
ScheduledInspections-400FlightCycleInspection
Procedure
Table1.ScheduledInspections—400-FlightCycleInspection
INITIAL
DATAREFERENCE/IMRR
TASKNUMBER
TASKDESCRIPTIONACCESSZONES
MECHOTHER
DATE:__________________W.O.
FACILITY:
HELICOPTERS/N:
REGISTRYNO.:
TOTALTIME:
SIGNATURE:
NOTE
Tobeperformedevery400Flightcycle.
GENERAL
1.Reviewhelicopterlogbookandensureall
recordeddiscrepancieshavebeencorrected.
2.Ensurecompliancewithallapplicable
airworthinessdirectives.
429-A-04-00-00-00A-009A-A
3.Ensurelifelimitedpartsdonotexceedservice
life.
429-MM,Chapter12
4.Ensureallrequiredlubricationtaskshavebeen
performed.
429-A-05-40-00-22A-281A-A
5.Ensureallrequiredmiscellaneousinspections
havebeenperformed,asapplicable.
429-MM,Chapter99
6.Ensureallrequiredinspectionsofinstalled
BHTkitsnotcoveredinthisinspectionhavebeen
performed,asapplicable.
7.Recordaccomplishmentofthisinspectioninthe
helicopterlogbook.
PREPARATIONTASKS
429-MM,Chapter531.Removepanels200CL,200CC,and200CR.
LANDINGGEAR
429-MM,Chapter32
327001
1.Doageneralvisualinspectionoftheforward
crosstubeassembly.
200CL,
200CC,
200CR
317
429-MM,Chapter32
327002
2.Doageneralvisualinspectionoftheaft
crosstubeassembly.
N/A
318
429-MM,Chapter32
327004
3.Doageneralvisualinspectionoftheskidtube
assemblies.
N/A
316
429-MM,Chapter32
327005
4.Doageneralvisualinspectionoftheforward
crosstubeattachmentclamps.
200CL,
200CC,
200CR
317
429-MM,Chapter32
327006
5.Doageneralvisualinspectionoftheaftpivot
assembly.
N/A
318
429-MM,Chapter32
327007
6.Doageneralvisualinspectionoftheaft
crosstubeattachmentclamp.
N/A
318
Applicableto:ALL429-A-05-40-00-32A-281A-A
ECCNEAR993DEC2019-Issue1Page1