135
Step 4 Repeat these same steps to install the X2 GT2
Belt on the opposite side.
Step 5 Installing the Y Axis GT2 Belt.
Step 5a Install the Rail Stops (QR1) and secure
with two M4 x 20 Machine Screws and
Locknuts for each side of the Gantry
Assembly.