Permanent Lead Anchoring and Tunneling
Clinician Manual
97035873-01 35 of 75
6. For Permanent Trials, proceed to the instructions for “Tunneling the Lead or Lead Extension” on page
35.
7. For Permanent IPG Implantation, proceed to the instructions for “IPG Implantation” on page 42.
Tunneling the Lead or Lead Extension
Note: If tunneling an Innion CX Lead, it is recommended to use the Long Tunneling Tool (35cm).
1. Attach the tunneling tool handle to the shaft by turning the locking mechanism clockwise.
Tool Handle
Locking Mechanism
Shaft
2. Mark the desired route of the tunnel.
3. Administer the appropriate local anesthetic along the tunneling path.
4. OPTIONAL. If necessary, bend the tool shaft to conform to the patient’s body.