EasyManua.ls Logo

Boston Scientific Precision - Tunneling the Lead or Lead Extension

Boston Scientific Precision
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Permanent Lead Anchoring and Tunneling
Clinician Manual
97035873-01 35 of 75
6. For Permanent Trials, proceed to the instructions for “Tunneling the Lead or Lead Extension” on page
35.
7. For Permanent IPG Implantation, proceed to the instructions for “IPG Implantation” on page 42.
Tunneling the Lead or Lead Extension
Note: If tunneling an Innion CX Lead, it is recommended to use the Long Tunneling Tool (35cm).
1. Attach the tunneling tool handle to the shaft by turning the locking mechanism clockwise.
Tool Handle
Locking Mechanism
Shaft
2. Mark the desired route of the tunnel.
3. Administer the appropriate local anesthetic along the tunneling path.
4. OPTIONAL. If necessary, bend the tool shaft to conform to the patient’s body.

Table of Contents

Related product manuals