21
6 Operation 6
6.1 First Startup
6.1
The BÖWE Customer Service department is responsible for carrying out the first startup.
Attention:
Before opening the switch panel or removing paneling, set the
main switch to " 0".
6.1.1 Preparatory Work
Set up the supply systems (electrical current, cooling water, compressed air, steam and condensate
lines).
6.1.2 Filling Machine With Solvent
(Gas displacement procedure is mandatory)
703867-04-A
Use only stabilized, high-purity TETRACHLORETHENE (perc), in accordance with DIN 53978.
The amount of solvent needed is:
P 12: approx. 220 l (approx. 360 kg) or approx. 58 US gal (approx. 794 lb)
for the 3-tank model* approx. 280 l (approx. 455 kg) or approx. 74 US gal (approx. 1003 lb)
P 15: approx. 260 l (approx. 420 kg) or approx. 69 US gal (approx. 926 lb)
for the 3-tank model* approx. 330 l (approx. 535 kg) or approx. 87 US gal (approx 1180 lb)
* Optional equipment
Tank 1 minimum filling volume P12: 60 l or 16 US gal
P15: 70 l or 18 US gal
Tank 3 minimum filling volume P12: 60 l or 16 US gal
P15: 70 l or 18 US gal