EasyManua.ls Logo

BÖWE P 12 - Page 54

BÖWE P 12
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
10 Operating and Monitoring Systems 10
Additional operating and monitoring systems
- Sight-glasses, tanks 1 + 2 (front)
- Overfill sensor, disposal vessel
- * Low pressure control switch (refrigeration)
- * High pressure control switch (refrigeration)
- Filter pressure gauge (front)
- Sight-glass, filter circuit (front)
- Thermal sensor, cage housing
inlet (front)
- Filter pressure switch
* only USA models
** only on machines that conform to the EN
ISO 8230 standard
P12

Table of Contents