ENGLISH 21 / 21CHAP. 6 – PRELIMINARY OPERATION
gs-200
CHAP. 6 - PRELIMINARY OPERATIONS
6.1 INSTALLATION
AGS-200 is supplied in a cardboard box. To open the box, cut the adhesive tape with a
cutter and take out the instrument, which is protected by two pieces of moulded
polystyrene.
If you have a TRO-040 or TRO-010 trolley, place AGS-200 in the relative support as
shown in the figure.