EasyManua.ls Logo

Broaster E 24 Series - Installation Inspection

Default Icon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - INSTALLATION INSPECTION
3-1
Before operating unit, be sure installa-
tion meets all requirements in the Instal-
lation Manual provided with your unit.
Follow cleaning instruc-
tions as outlined in this
manual before operating the first time.
See section 9 - CLEANING.
A remote circuit breaker or fuse should
be installed in the main power supply
located in a path of exit and clearly iden-
tified.
To avoid splashing of hot liquid, unit
must be restrained to prevent tipping.
Always lock front casters. This can be
done by installing the unit in a battery of
appliances, in an alcove or with ade-
quate ties.
See Safety Relief Valve under GET-
TING TO KNOW YOUR BROASTER
®
PRESSURE FRYER (Section 4). DO
NOT install unit where traffic area’s are
on either side or in back of unit.
The appliance, when
installed, must be
electrically grounded in accordance with
local codes, or in the absence of local
codes, with the National Electrical Code,
NFPA 70, or the Canadian Electrical
Code, CSA C22.2, as applicable.
ES24G:
Electrical Grounding
Instructions - The Model
ES24G is equipped with a three-prong
(grounding) plug for your protection
against shock hazard and should be
plugged directly into a properly
grounded three-prong receptacle.
DO
NOT
cut or remove grounding prong
from this plug.
A gas shutoff valve, installed in gas sup-
ply line, should be located in a path of
exit and clearly identified.
Gas Conversion: Contact your local
Broaster Company representative for con-
verting from one type of gas to another.
The installation must
conform with local codes,
or in the absence of local codes, with the
National Fuel Gas Code, ANSI Z223.1/
NFPA 54, or the Natural Gas and Propane
Installation Code, CSA B149.1, as
applicable, including;
i) The appliance and its individual shutoff
valve must be disconnected from the gas
supply piping system during any
pressure testing of that system at test
pressures in excess of 1/2 psi (3.5 kPa).
ii) The appliance must be isolated from
the gas supply piping system by closing
its individual manual shutoff valve during
any pressure testing of the gas supply
piping system at test pressures equal to
or less than 1/2 psi (3.5 kPa).
broaster.com Manual #21469 621 Rev 11/23

Related product manuals