EasyManuals Logo

Brocade Communications Systems FCX Series User Manual

Brocade Communications Systems FCX Series
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Rack mount installation
NOTE
You need a #2 Phillips screwdriver for installation.
Before mounting the switch in a rack, pay particular attention to the following factors:
Temperature: Since the temperature within a rack assembly may be higher than the ambient room
temperature, check that the rack-environment temperature is within the specified operating
temperature range.
Mechanical loading: Do not place any equipment on top of a rack-mounted unit.
Circuit overloading: Be sure that the supply circuit to the rack assembly is not overloaded.
Grounding: Rack-mounted equipment should be properly grounded. Particular attention should be
given to supply connections other than direct connections to the mains.
Use the following setps to mount devices in rack.
1. Remove the rack mount kit from the shipping carton. The kit contains two L-shaped mounting
brackets and mounting screws.
2. Attach the mounting brackets to the sides of the device.
Rack mount installation
38 Brocade FCX Series Hardware Installation Guide
53-1002977-01

Table of Contents

Other manuals for Brocade Communications Systems FCX Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Brocade Communications Systems FCX Series and is the answer not in the manual?

Brocade Communications Systems FCX Series Specifications

General IconGeneral
BrandBrocade Communications Systems
ModelFCX Series
CategorySwitch
LanguageEnglish

Related product manuals