EasyManua.ls Logo

BT SWE200D - Page 33

BT SWE200D
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Maintenance schedule
© BT Repair manual SWE100, 120, 120L, 120S, 140, 140L, 200D 5 – 7
Order no.. Date Valid from serial no. T code
258946-120 2012-08-30 6061850- 841×842×843
Support arm
wheel
11 5.5
1.Not applicable for SWE120S
Work area Pos. Action 750h/12m Estima
ted
time
4110 Tiller arm
a Check the mountings. X 1:45
minutes
b Inspect the operating
console for correct
mounting
X
c Check the mounting of
the handle.
X
d Check the force and
locking of the gas strut.
The tiller arm should
return to the top position
both from the bottom
position and from the
lower position where the
brake is applied.
X
Check that the braking
function is activated in
both upper and lower tiller
arm positions.
Wheels Standard
measurements, mm
Minimum
dimensions,
mm
https://www.besttruckmanuals.com/

Table of Contents

Related product manuals