BYK-Gardner GmbH Getting Started | 3
301 200 085 E 2403 wave-scan 3 / wave-scan 3 dual 19
3.2 Powering the Instrument
The measurement unit can be operated with the rechargeable battery pack included in the de-
livery. Depending on the specific brand, the capacity of the battery pack is sufficient for up to
1,000 measurements.
3.2.1 Rechargeable Battery Pack
To place the instrument in service, the rechargeable battery pack must be inserted until it locks
in place. The second battery pack is inserted in the docking station. The battery pack can only
be attached when it is in the correct position.
WARNING: Removal of rechargeable battery pack
Do not remove the rechargeable battery pack while the instrument is switched on. Always per-
form regular shutdown before opening the instrument’s housing.
When inserting the rechargeable battery pack, ensure that its contacts are aligned with those of
the instrument.
NOTICE: Using rechargeable battery packs
To ensure uniform utilization, the rechargeable battery packs should be exchanged regularly be-
tween instrument and docking station. The recommendation is a weekly exchange.
The rechargeable battery pack should be fully charged in regular intervals to maintain its full ca-
pacity. The recommendation is at least once every 6 months.