EasyManua.ls Logo

Carrier 58HDX - CONCENTRIC TERMINATION; Vent Termination Clearances; Carbon Monoxide Poisoning, Fire and Explosion Hazard; Vertical & Horizontal Termination

Carrier 58HDX
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONCENTRIC
TERMINATION
Vent
Termination
Clearances
CARBON
MONOXIDE
POISONING,
FIRE
AND
EXPLOSION
HAZARD
Failure
to
follow
this
warning
could
result
in
personal
injury,
death,
or
property
damage.
Inlet
and
outlet
pipes
may
NOT
be
vented
directly
above
each
other
(standard
vent
terminals).
1.
Determine
termination
locations
based
on
clearances
spe-
cified
in
following
steps
and
as
shown
in
Fig.
7,
Fig.
30
through
Fig.
35.
2.
The
vent
termination
must
be
located
at
least
12”
(305
mm)
above
ground
or
normally
expected
snow
accumula-
tion
levels.
3.
Do
NOT
terminate
over
public
walkways.
Avoid
areas
where
condensate
may
cause
problems
such
as
above
planters,
patios,
or
adjacent
to
windows
where
steam
may
cause
fogging.
4.
The
vent
termination
shall
be
located
at
least
4’
(1.2
M)
horizontally
from
any
electric
meter,
gas
meter,
gas
regu-
lator,
and
any
relief
equipment.
These
distances
apply
ONLY
to
U.S.
installations.
5.
The
vent
termination
is
to
be
located
at
least
3’
(.91
M)
above
any
forced
air
inlet
located
within
10’
(3.1
M);
(3.1
M)
and
at
least
10’
(3.1
M)
from
a
combustion
air
intake
of
another
appliance,
except
another
direct
vent
furnace
in-
take.
6.
In
Canada,
the
Canadian
Fuel
Gas
Code
takes
precedence
over
the
preceding
termination
instructions.
Concentric
Vent
Termination
-
Kit
#
KGAVT0701CVT
&
KGAVT0801CVT
These
kits
are
for
vertical
or
horizontal
termination
of
the
combustion
air
inlet
and
the
exhaust
vent
pipes
on
Category
IV
gas-fired
condensing
furnaces.
The
KGAVTO801CVT
kit
can
be
used
for
3”
(76
mm)
diameter
pipe
systems. The
KGAVTO701CVT
kit
can
be
used
for
2”
(51
mm)
diameter
pipe
system.
Refer
to
Table
4
for the
correct
pipe
size
for
the
furnace.
Both
the
combustion
air
inlet
and
the
exhaust
vent
pipes
must
attach
to
the
termination
kit.
The
termination
kit
must
terminate
outside
the
structure
and
must
be
installed
per
the
instructions
outlined
below
for
vertical
or
horizontal
termination.
Vertical
termination
is
preferred.
Field
supplied
pipe
and
fittings
are
required
to
complete
the
installation.
Vertical
&
Horizontal
Termination
1.
Determine
the
pipe
diameters
required
for the
installation
from
Table
4
and
Fig.
32.
2.
Determine
the
best
location
for the
termination
kit.
See
Fig.
31
for
vertical
termination
or
Fig.
35
for
horizontal
termination.
Roof
termination
is
preferred
since
it
is
less
susceptible
to
damage,
has
reduced
intake
contaminants
and
less
visible
vent
vapor.
For
side
wall
termination,
con-
sideration
should
be
given
to:
1)
possible
damage
from
the
vapors
to
plants/shrubs,
other
equipment
and
building
ma-
terials,
2)
possible
damage
to
the
terminal
from
foreign
ob-
jects,
3)
wind
effects
that
may
cause recirculation
of
flue
products,
debris
or
light
snow
and
4)
visible
vent
vapor.
3.
Cut
one
5”
(127
mm)
diameter
hole
through
the
structure
for
the
KGAVTO801CVT
Kit
or
one
4”
(102
mm)
diamet-
er
hole
for
the
KGAVTO7O1CVT
Kit
.
Kit
Contents:
3
in.
(76)
Rain
Cap
or
2
in.
(51)
Rain
Cap
3
in.
(76)
Diameter
SDR-26
Pipe,
19-1/2
in.
(495)
Long
or
Ain.
(102)
Diameter
SDR-26
Pipe,
24
in.
(610)
Long,
2
in.
(51)
Diameter
SDR-26
Pipe,
31-5/8
in.
(803)
Long
or
2-1/2
in.
(64)
Diameter
SDR-26
Pipe,
37-1/8
in.
(943)
Long,
3
in.
(76)
¥
Concentric
Fitting
or
2
in.
(51)
¥
Concentric
Fitting
2
in.
1)
or
3
in.
(76)
Dia.
Rain
Cap
Nominal
3
in.
(76)
or
4
in.
(102)
Dia.
SDR-26
Pipe
3
2
in.
(51)
or
3
in.
(76)
Dia.
Y
Concentric
Fitting
2
in.
(51)
of
2-1/2
in.
(64)
Dia.
SDR-26
Pipe
A07719
Fig.
30
-
Kit
Components
Vent
A
an
,
4a
Maintain
12
in.
(304.8mm)
min.
clear-
:
ance
above
highest
anticipated
snow
level.
Max.
of
24
in.
(609.6mm)
above
roof.
Combustion
Air
.
NY
Roof
Boot/_
|
Flashing
=~
ed®
(Field
Suppli
Support
(Field
Supplied)
45°
Elbow
a
Field
Supplied)
Note:
a
25-22-02
Support
must
be
field
installed
to
secure
termination
kit
to
structure.
A07720
Fig.
31
-
Concentric
Vent
Roof
Installation
4.
Dimension
D
may
be
lengthened
to
60”
(1524
mm)
max.
or
shortened
by
cutting
the
pipes
to
12”
(305
mm)
min.
Dimension
A
will
change
according
to
D
dimension.
(See
Fig. 32).
5.
Partially
assemble
the
concentric
vent
termination
kit.
Clean
and
cement
the
parts
using
the
procedures
for
Join-
ing
Pipe
and
Fittings
section
of
the
manual.
A)
Cement
the
Y
Concentric
fitting
to
the
longest
of
the
two
straight
kit
pipes.
(See
Fig.
30)
B)
Cement
the
rain
cap
to
the
shortest
of
the
straight
kit
parts.
(See
Fig.
30).
NOTE:
A
field
supplied
stainless
steel
screw
may
be
used
to
secure
the
rain
cap
to
the
pipe
instead
of
cementing
when
field
disassembly
is
desired
for
cleaning
(See
Fig.
33).

Other manuals for Carrier 58HDX

Related product manuals