5. Slide the CP6000 CMT over the conduit stub-ups until the top surface of the template is level with
the top surface of the concrete when poured.
The bottom of the upper template (a) must align with the surface of the concrete (b).
6. Ensure the conduits are plumb.
31
Installation into New Concrete