7. Use a level to check that the CP6000 CMT is level from front to back and from side to side.
8. Conduit height (c) must be between 152 mm (6 in) and 590 (23-1/4 in). Each bolt (d) must extend
between 60 mm (2-1/2 in) and 100 mm (4 in) above the concrete surface.
9. Before pouring concrete, tie the CP6000 CMT to rebar to help hold it in place.