EasyManua.ls Logo

Chloride 700 - 3 Setup and Installation; Delivery; Unpacking; Scope of Delivery

Default Icon
234 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Chloride Active
UK
3 Setup and Installation
3.1 Delivery
This unit has been thoroughly checked before shipment. Upon receipt, check the packaging and ensure that
the contents are undamaged. Any damage must be reported to the shipper and any missing parts must be
reported to the supplier immediately.
3.2 Unpacking
Care should be taken when removing the packaging in order to avoid damaging the unit. Check all packaging
materials to ensure that no items are discarded (please see below gures). Note that they are only descriptive
gures whose content is subject to changes according to local markets.
3.3 Scope of delivery
The following items are included within the packaging:
3.3.1 Tower units (UPS)
- 1 x this user manual
- 1 x UPS unit
- 1 x quickstart guide
- 1 x CD with user software
- 2 x connection cables IEC320 C14 (male) - IEC C13 (female) for the UPS output
- 1 x RS232 interface cable
- 1 x USB cable
3.3.2 Tower units (Battery Packs)
- 1 x Battery Pack unit
- 1 x battery extension cable
- 1 x battery pack detection cable for auto-detection of number of battery packs connected
3.3.3 Rack/Tower units (UPS)
- 1 x this user manual
- 1 x UPS unit
- 1 x quickstart guide
- 1 x CD with user software
- Connection cables as per below:
1 and 1.5kVA rack/tower units
2 and 3kVA rack/tower units
Tower units

Table of Contents

Related product manuals