EasyManua.ls Logo

Cinergia B2C10 - Initialization; Standby

Cinergia B2C10
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EL DC Instalation and operation manual v13.docx
29 / 56
Initialization
EMCY
sequence?
Standby
Yes
No
Enable?
Precharge
Yes
Ready
Run? Enable?
No
Run
Yes
Yes
Run? Enable?
Yes
No
Yes
Error
From any
Reset?
Yes No
4.2.1. Initialization
During the initialization, the converter control system checks the presence of all internal
components and the embedded PC loads the operating system.
No voltage is present at the DC link and the IGBTs PWMs are completely stopped.
The transition from Initialization state brings the converter to the Standby state as long as the
emergency stop is deactivated (equipment armed).
4.2.2. Standby
The Standby state keeps the converter in low power mode until an Enable signal is received.
While the converter is in standby only the internal power supplies are energized. In particular,

Table of Contents