EasyManua.ls Logo

Cinergia B2C10 - Supervision

Cinergia B2C10
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EL DC Instalation and operation manual v13.docx
51 / 56
7.2. Supervision
- A: Information about the electrical parameters of both converters:
- Voltage
- Current
- Frequency
- Temperatures
- Active power
- Reactive power
- Voltage DC link
- B: Current trend plots:
- Three variable per plot are allowed at the same time.
- Due to a long refreshing time, it is not possible to detect fast current transients of
the variables.

Table of Contents