3-23
Catalyst 3560 Switch Hardware Installation Guide
78-16057-01
Chapter 3 Switch Installation
Installing the Switch
Figure 3-13 Mounting the Switch on a Wall
After the switch is mounted on the wall, you need to do these tasks to complete
the installation:
• Power on the switch. See the “Powering On the Switch” section on page 1-3.
• Connect to a 10/100 port, and run Express Setup. See the “Starting Express
Setup” section on page 1-4.
• Connect to the front-panel ports. See the “Connecting to the 10/100 Ports”
section on page 3-29 and the “Connecting to SFP Modules” section on
page 3-32 to complete the installation.
For configuration instructions about using the CLI setup program, go to
Appendix C, “Configuring the Switch with the CLI-Based Setup Program.”
1 User-supplied screws
97927
C
ata
ly
st
375
0
S
E
R
IE
S
13
X
14
X
S
Y
S
T
R
P
S
M
A
S
T
R
S
T
A
T
D
U
P
L
X
S
P
E
E
D
S
T
A
C
K
M
O
D
E
2X
2X
2X
1
1