Cisco ONS 15454 Procedure Guide, R4.0
March 2003
Chapter 1 Install the Shelf and Backplane Cable
NTP-A6 Install the Power and Ground
Note When terminating battery and battery return connections as shown in Figure 1-10, follow a
torque specification of 10 in-lb.
Step 7 Terminate the return 1 lead to the RET1 backplane terminal. Use oxidation-prevention grease to keep
connections noncorrosive.
Warning
Do not secure multiple connectors with the same bolt assembly.
Step 8 Terminate the negative 1 lead to the negative BAT1 backplane power terminal. Use oxidation prevention
grease to keep connections noncorrosive.
Step 9 If you use redundant power leads, terminate the return 2 lead to the positive RET2 terminal on the
ONS 15454. Terminate the negative 2 lead to the negative BAT2 terminal on the ONS 15454. Use
oxidation-preventative grease to keep connections noncorrosive.
Step 10 Route the cables out below the power terminals using the plastic cable clamp, as shown in Figure 1-10
on page 1-27.
Step 11 Return to your originating procedure (NTP).
DLP-A18 Turn On and Verify Office Power
Step 1 Using a voltmeter, verify the office battery and ground at the following points on the fuse and alarm
panel:
a. To verify the power, place the black test lead of the voltmeter to the frame ground. Place the red test
lead on the A-side connection and verify that it is between –42 VDC and –57 VDC. Place the red
test lead on the B-side connection and verify that it is between –42 VDC and –57 VDC.
Note The voltages –42 VDC and –57 VDC are, respectively, the minimum and maximum voltages
required to power the chassis.
b. To verify the ground, place the black test lead of the voltmeter to the frame ground. Place the red
test lead on the A-side return ground and verify that no voltage is present. Place the red test lead on
the B-side return ground and verify that no voltage is present.
Purpose This task measures the power to verify correct power and returns.
Tools/Equipment Voltmeter
Prerequisite Procedures DLP-A15 Verify that the Correct Fuse and Alarm Panel is Installed in the
Equipment Rack, page 1-24
DLP-A16 Connect the Office Ground to the ONS 15454, page 1-25
DLP-A17 Connect Office Power to the ONS 15454 Shelf, page 1-26
Required/As Needed Required
Onsite/Remote Onsite
Security Level None