EasyManua.ls Logo

Cisco ONS 15454 - DLP-A 31 Attach Ferrites to Wire-Wrap Pin Fields

Cisco ONS 15454
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-59
Cisco ONS 15454 Procedure Guide, R4.0
March 2003
Chapter 1 Install the Shelf and Backplane Cable
NTP-A12 Install Ferrites
DLP-A31 Attach Ferrites to Wire-Wrap Pin Fields
Step 1 Wrap the cables once around and through the block ferrites and pull the cables straight through the oval
ferrites.
Step 2 Place the oval ferrite as close to the wire-wrap pin field as possible and between the ONS 15454 and the
block ferrite, as shown in Figure 1-27. The block ferrite should be within 5 to 6 inches (127 to 152 mm)
of the wire-wrap pin field.
Figure 1-27 Attaching Ferrites to Wire-Wrap Pin Fields
Step 3
Return to your originating procedure (NTP).
Purpose This task attaches ferrites to wire-wrap pin fields. Use an oval ferrite
(TDK ZCAT1730-0730) and block ferrite (Fair Rite 0443164151) for each
pair of cables. Figure 1-27 on page 1-59 shows the suggested method for
attaching ferrites to wire-wrap pin fields.
Tools/Equipment Oval and block ferrites
Prerequisite Procedures NTP-A8 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections,
page 1-34
Required/As Needed As needed
Onsite/Remote Onsite
Security Level None
B
A
32091

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals