Cisco ONS 15454 Procedure Guide, R4.0
March 2003
Chapter 1 Install the Shelf and Backplane Cable
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly
Test Equipment
• Voltmeter
• Optical power meter (for use with fiber optics only)
• Bit error rate (BER) tester, DS-1 and DS-3
NTP-A 1 Unpack and Inspect the ONS 15454 Shelf Assembly
Step 1 Complete the “DLP-A1 Unpack and Verify the Shelf Assembly” task on page 1-4.
Step 2 Complete the “DLP-A2 Inspect the Shelf Assembly” task on page 1-5.
Step 3 Continue with the “NTP-A2 Install the Shelf Assembly” procedure on page 1-5.
Stop. You have completed this procedure.
DLP-A1 Unpack and Verify the Shelf Assembly
Step 1 When you receive the ONS 15454 system equipment at the installation site, open the top of the box. The
Cisco Systems logo designates the top of the box.
Step 2 Remove the foam inserts from the box. The box contains the 15454 shelf (wrapped in plastic) and a
smaller box of items needed for installation.
Step 3 To remove the shelf, grasp both rings of the shelf removal strap and slowly lift the shelf out of the box.
Step 4 Open the smaller box of installation materials, and verify that you have all items listed in the “Included
Materials” section on page 1-2.
Purpose This procedure describes how to unpack the ONS 15454 and verify the
contents.
Tools/Equipment Pinned hex (Allen) key for front door
Prerequisite Procedures None
Required/As Needed Required
Onsite/Remote Onsite
Security Level None
Purpose This task removes the shelf assembly from the package.
Tools/Equipment None
Prerequisite Procedures None
Required/As Needed Required
Onsite/Remote Onsite
Security Level None