EasyManua.ls Logo

CleaverBrooks CBEX-DE - Introduction

CleaverBrooks CBEX-DE
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONTENTS
CHAPTER 1 Introduction 1-1
Overview 1-1
Component Locations 1-3
CHAPTER 2 Waterside Care 2-1
Water requirements - steam boilers 2-1
Water requirements - hot water boilers 2-2
Water Treatment 2-4
Cleaning 2-5
Boil-Out of a New Unit 2-6
Washing Out 2-8
Blowdown - Steam Boilers 2-9
Periodic Inspection 2-12
Preparation for Extended Layup 2-13
CHAPTER 3 Preparations for Startup 3-1
Pre-Startup Adjustments 3-1
Burner Operating Controls: General 3-2
Control Checks 3-5
Low Water Cutoff Devices: Steam and Hot Water 3-6
Combustion Air Proving Switch 3-6
Atomizing Air Proving Switch 3-6
Gas Pilot Flame Adjustment 3-7
Gas Pressure and Flow Information 3-8
Adjusting Combustion 3-12
Linkage Settings (optional single-point systems) 3-12
Low Gas Pressure Switch 3-19
High Gas Pressure Switch 3-20
Burner Drawer Adjustment 3-20
Oil Drawer Switch 3-21
CHAPTER 4 Startup and Operation 4-1
Sequence of Operation 4-1
Flame Loss Sequence 4-4
General Preparation for Startup: All Fuels 4-6
Control Settings: Steam and Hot Water 4-7
Gas Pilot 4-7
Atomizing Air 4-7
Firing Preparations for No. 2 Oil (Series 100, 200) 4-9
Firing Preparations for Gas (Series 200, 700) 4-11
Startup, Operating, and Shutdown: All Fuels 4-12
Control Operational Checks 4-14
Troubleshooting 4-15
Emergency Shutdown 4-19

Table of Contents

Related product manuals