Maintenance
WYE strainers require little monitoring once they are
strainer should be checked periodically to determine if the
screen needs to be cleaned or replaced. If the pressure
completely clogged, the screen will break and require
replacing. Note: Strainer screens are not designed to
withstand the same pressure ratings as the housings. If the
screen becomes completely clogged, it will be exposed to
the same pressure as the housing. In most cases, this will
cause the screen to fail and potentially damage downstream
equipment.
Regular maintenance involves:
• Timely cleaning or replacement of screen
• Periodically checking for leaks
During normal use, the screen will become clogged
an unacceptable value, typically by 5 psi to 10 psi, it is time
to clean or replace the screen. It is not advisable to let the
screen to fail and possibly damage downstream equipment.
A convenient and safe way to determine when the screen
needs to be replaced is to install pressure gauges on
the inlet and outlet sides of the strainer. The maximum
acceptable pressure drop across the strainer will indicate
when the screen needs to be replaced. Screen size and
construction determine the maximum pressure drop that a
strainer screen can withstand.
WYE Strainers
Screen Removal/Cleaning/Replacement
1. Isolate the strainer by closing the inlet and outlet valve
connections on either side of the WYE strainer. Make
sure valves are bubble tight.
2.
the strainer.
3. Once pressure is relieved, remove the WYE side cap or
cover.
4. Remove screen and clean. Do not permit screed to
hardened. Avoid banging or hitting the screen to
remove stubborn debris.
5. Inspect screen and cover gasket for damage. If either is
damaged, replace. Always ensure there is a spare gasket
and screen on hand prior to maintenance.
6. Remove any debris or sludge from within the strainer.
7. Replace cleaned or new screen into its original position,
ensuring it is squarely positioned on the screen.
8. Replace cover gasket and cap or cover. Tighten cap or
Follow the Start-up procedure outlined within the Operation
Instructions.
Start-Up Procedure
1.
Note:
than water or when the working temperature is above
when venting or servicing is performed.
2. Start the piping system by opening the outlet valve
open the inlet valve nearest the WYE strainers’ inlet,
is important to start the system gradually to avoid
displacing or damaging the WYE strainer.
3. Continue to open the inlet valve until the desired