31
SeeleyInternationalPtyLtd
INSTALLATIONCHECKLIST
The cooler is adequately supported, secure and level.
thecoolerwasmade.
he water is connected with no leaks at fittings.
Waterpipesarecorrectlysaddledaspertheapplicableplumbing
regulations.
The drain water does not discharge onto the roof surface.
The power supply adheres to all local and national regulations and is wired
back to the distribution board on its own separate circuit.
cableshavebeencorrectlyconnectedtothecontrolboxes(i.e.power
supply,controlcable)
Theownerhasbeeninstructedhowtheycanelectricallyisolatethecooler
atthemeterboxincaseofanemergency.
All ducts are fixed correctly and there are no air leaks.
Thesystemhasbeenrunfromthecustomerswallcontrolandallfunctions
workcorrectly.
Theairbalanceforalloutletshasbeenadjustedtothecustomers
satisfaction.
Thecustomerhasbeenshownhowtooperatethesystem.
All the installation rubbish has been removed and, if applicable, any property
damage repaired.
Signed by Installer: …………………………………………………
Dated: ………………………………………………………………
Thewaterpipeswereflushedofanyforeignmaterialsbeforeconnection
to
T
The owner has been instructed on how to isolate the water to the system in
case of emergency.
All
OwnersName:
Telephone:
Address:
Dealer:
Installer:
DateInstalled:
ModelNo.:
SerialNo.:
859736-A AU1007