MAN.241 Rev.5 ENG - Use and maintenance manual S23 page 104 of 127
11 Stability and over-
load tests
During the commissioning of the machine,
in the final test, we carried out the follow-
ing stability and overload tests to verify
S23 structural strength.
These tests shall be carried out only on the
first test of the machine. You shall not repeat
tests with the same loads.
Stability tests
Test
nr.
Load
(Kg)
Aerial part position
Side
Out-
come
Out-
reach
(m)
Panto-
graph
Boom
1
200 (NL)
+
130 (TL)
11,40
at 40°
hori-
zontal
lateral
(at
1.5°)
OK
Overload tests
Test
nr.
Load
(Kg)
Aerial part position
Side
Out-
come
Out-
reach
(m)
Panto-
graph
Boom
1
200 (NL)
+
100 (TL)
11,40
at 40°
hori-
zontal
lateral
OK
NOTES.