LS1000 VoIP Speakerphone
Administrator Guide
page 50 of 54 GU-164-B
Code Blue
• 259 Hedcor Street • Holland, MI 49423 USA • 800.205.7186 • www.codeblue.com
16 Maintenance Schedule
Guard Tasks Technician Tasks
G
T
LEGEND
DAILY OR WEEKLY
Ensure all electrical connections are secure
Check all phone connections for corrosion (If corroded, clean and coat with dielectric gel or replace)
Ensure all battery connections are tight and clean
Verify no stains exist around gasket areas (stains indicate leaking & gasket should be replaced)
Verify moisture weep hole on cabinet bottom is open and unobstructed
Verify bottom of bollards are at least 1/2 inch above footing and free of obstructions (only applies to
CB1, CB5, CB9, & CBRT units)
Remove access door and faceplate assembly to inspect the following:
Replace batteries used with NightCharge®, cellular or RF systems (Replace with batteries recommended
by the communication manufacturer to ensure optimal performance)
MONTHLY OR QUARTERLY
G
G
G
Action: Press Red Button
Strobe activates
Red LED "Call Placed" light turns on
Message plays
Call connects, green LED "Call Received" light turns on
Confirm conversation clarity with dispatch
Perform functional communications check.
T
T
Faceplate light
Beacon/Strobe
Visually check lighting functions:
Faceplate
Piezo Button
Microphone
Speaker
Visually inspect unit for damage to:
Functioning with full charge
Recharging fully, including NightCharge®/Solar Units(Note: recommend mid-to-late afternoon
inspection)
Check Batteries:
BIANNUALLY
G
G
Apply automotive paint sealant to unit exterior for protecting finish against environmental
pollutants (Suggested products include Black Magic Wet Shine Liquid Wax, Nu Finish NFP-80, and 5
Star Shine)
Clean & coat exterior stainless steel cabinets with cleaner/polish (Suggested products include Chase
Products' Champion Spray-on Stainless Steel Cleaner to help protect finish against environmental
pollutants)
T
T
Visually confirm line-of-sight is still clear to base station (i.e., confirm that new tree growth, new
building construction or other obstructions are not bloacking view of base station)
ANNUALLY