EasyManua.ls Logo

Conair 150 - Preparing for Installation

Conair 150
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for Installation
The Carousel Plus W Series Dryer is easy to install if you plan the location and
prepare the mounting area properly.
1 Make sure the mounting area provides:
A grounded power source supplying the voltage and correct current
for your dryer model. Check the dryer’s serial tag for the correct amps, volt-
age, phase, and cycles. Field wiring should be completed by qualified person-
nel to the planned location for the dryer. All electrical wiring should comply
with your region’s electrical codes.
A source of water, if you have an aftercooler and/or optional
precooler. The W dryer’s aftercooler and optional precooler require 3
gals./min. {11.4 liters/min.} tower, city, or chiller water at temperatures of
45° to 85°F {7° to 29°C}. Pipe should be run to the planned dryer location.
Use flexible hose to connect the water pipes to the aftercooler and/or optional
precooler.
Minimum clearance for safe operation and maintenance.
You should maintain 24 in. {61 cm} clearance on all sides of the dryer.
3-4 l Installation
Material and conveying lines
installed. If you plan to use
vacuum or compressed air
loaders to fill the hopper,
install conveying lines to the
drying hopper location.

Table of Contents

Related product manuals