EasyManua.ls Logo

Conair 150 - Page 40

Conair 150
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
REGENERATION TEMP
ACT 425
˚
F SET 425
˚
F
RETURN AIR TEMP
ACT 120˚F SET 120˚F
PROCESS DEWPOINT
ACT -47˚F SET -40˚F
POWER ON
CONAIR CP100
CV00.06.2 DV00.09.8
3 SEC DELAY
MONDAY
7/22/2003 07:59 AM
3 SEC DELAY
PROCESS TEMPERATURE
Act 140˚F Set 140˚F
REGENERATION TEMP
ACT 350
˚
F SET 350˚F
RETURN AIR TEMP
ACT 120˚F SET 120˚F
MACHINE LOADER
LOAD TIME 10 SEC
HOPPER LOADER
LOAD TIME
10 SEC
PRESS MENU KEY
AT ANY TIME
DRYER MAIN MENU
STAT SETUP DIAG
Central Dryer
STD DRYER
1
2
3
4
5
MDC HOPPER LOADER
PROCESS DEWPOINT
ACT -47˚F SET -40˚F
6
7
11
12
4
5
11
MACHINE LOADER
LOAD TIME 10 SEC
MDC
6
PRESS
MENU
KEY
PRESS
MENU
KEY
MDC HOPPER LOADER AND RATIO
6
8
9
10
MACHINE LOADER
LOAD TIME 10 SEC
HOPPER LDR VIRGIN
LOAD TIME 20 SEC
HOPPER LDR REGRIND
LOAD TIME 20 SEC
HOPPER LOADER
LAYERING ON
DM T6 TOP
ACT 150˚F
DM T5
ACT 155˚F
DM T4
ACT 158˚F
DM T3
ACT 160˚F
DM T2
ACT 163˚F
DM T1 BOTTOM
ACT 165˚F
103
104
105
106
107
108
When configured as a
central dryer, there is
no process heater in the
system. Therefore, any
function associated with
the process heater is not
available for central
dryer configurations.
4-4 l Operation
NOTE: If you have purchased the DM-II (drying monitor)
option, see the DM-II Appendix for information pertaining
to its operation.
When the DM-II monitor option is purchased
these screens will be displayed.

Table of Contents

Related product manuals