GENERAL INFORMATION GI-9
9. If snap-in connections have latching clips, those
connections can be interrupted by pressing the clips down
according to the directions specified in the adjacent
drawing.
10. The latching clips are properly locked in place when you
can hear a click noise.
click
11. When conducting continuity checks or voltage
measurements with a circuit tester, the test probe must be
inserted in the terminals at the wiring harness side. In the
case of a shielded connection the probe must be inserted
through the cable opening of the rubber cap until contact is
made with the terminal. Pay attention not to damage the
insulation and wires.
Plug connection
Test probe
Test probe
12. Take into account the electric load caused by additional
equipment in order to avoid wiring overload.