EasyManua.ls Logo

CPN MC3 ELITE - Radioactive Labeling and Marking

CPN MC3 ELITE
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstroTek
67
Packaging
The package the gauge is shipped in, must meet certain
requirements. For radioactive material in Special Form, a Type
A package is appropriate. The package or a prototype must
be tested and a copy of the Type A Evaluation Report and
Certificate maintained on file for at least one year after the
latest shipment. This document will normally be supplied by the
gauge manufacturer. The manufacturer must also provide a
Closure Instructions document for the Type A package. This
document should be kept in the gauge case at all times. The
Type A tests include; water spray, free drop, corner drop,
compression, and penetration test.
Labeling
A radioactive label must be selected from the following:
RADIOACTIVE
Dose rate at
package surface
Transport Index
WHITE-I
= or < 0.5 mRem/hr.
NA
YELLOW-II
>0.5 mRem/hr. to =
or < 50.0 mRem/hr.
= or < 1.0
YELLOW-III
>50.0 mRem/hr.
= or < 10.0
Fig 6.1 Various Label Dose Rates and Transport Indexes

Table of Contents