EasyManua.ls Logo

Daikin Enfinity VFC - RECEIVING AND STORAGE; Pre-Installation

Daikin Enfinity VFC
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
reCeiving and storage
www.DaikinApplied.com 5 EnnityVerticalWaterSourceHeatPumps IM 930-6
Sharpedgescancausepersonalinjury.Avoidcontactwiththem.
Usecareandwearprotectiveclothing,safetyglassesandgloves
whenhandlingpartsandservicingheatpumps.
CAUTION
Uponreceiptoftheequipment,checkcartonforvisible
damage.Makeanotationontheshippersdelivery
ticketbeforesigning.Ifthereisanyevidenceofrough
handling,immediatelyopenthecartonstocheckfor
concealeddamage.Ifanydamageisfound,notify
thecarrierwithin48hourstoestablishyourclaimand
requesttheirinspectionandareport.TheWarranty
ClaimsDepartmentshouldthenbecontacted.
Donotstandortransportthemachinesonend.For
storing,eachcartonismarkedwith“up”arrows.
Intheeventthatelevatortransfermakesup-ended
positioningunavoidable,donotoperatethemachine
untilithasbeeninthenormaluprightpositionforatleast
24hours.
Temporarystorageatthejobsitemustbeindoor,
completelyshelteredfromrain,snow,etc.Highorlow
temperaturesnaturallyassociatedwithweatherpatterns
willnotharmtheunits.Excessivelyhightemperatures,
140°F(60°C)andhigher,maydeterioratecertainplastic
materialsandcausepermanentdamage.
IMPORTANT
Thisproductwascarefullypackedandthoroughlyinspected
beforeleavingthefactory.Responsibilityforitssafedelivery
wasassumedbythecarrieruponacceptanceofthe
shipment.Claimsforlossordamagesustainedintransit
mustthereforebemadeuponthecarrierasfollows:
VISIBLE LOSS OR DAMAGE
Anyexternalevidenceoflossordamagemustbenoted
onthefreightbillorcarriersreceipt,andsignedbythe
carriersagent.Failuretoadequatelydescribesuchexternal
evidenceoflossordamagemayresultinthecarriers
refusaltohonoradamageclaim.Theformrequiredtole
suchaclaimwillbesuppliedbythecarrier.
CONCEALED LOSS OR DAMAGE
Concealedlossordamagemeanslossordamagewhich
doesnotbecomeapparentuntiltheproducthasbeen
unpacked.Thecontentsmaybedamagedintransitdue
toroughhandlingeventhoughthecartonmaynotshow
externaldamages.Whenthedamageisdiscoveredupon
unpacking,makeawrittenrequestforinspectionbythe
carriersagentwithinfteen(15)daysofthedeliverydate
andleaclaimwiththecarrier.
Pre-Installation
WARNING
The installer must determine and follow all applicable codes
andregulations.Thisequipmentpresentshazardsofelectricity,
rotatingparts,sharpedges,heatandweight.Failuretoreadand
followtheseinstructionscanresultinpropertydamage,severe
personal injury or death. This equipment must be installed by
experienced,trainedpersonnelonly.
1. Topreventdamage,donotoperatethisequipment
forsupplementaryheatingandcoolingduringthe
constructionperiod.
2. Inspectthecartonforanyspecictaggingnumbers
indicatedbythefactoryperarequestfromthe
installingcontractor.Atthistimethevoltage,phase
andcapacityshouldbecheckedagainsttheplans.
3. Checktheunitsizeagainsttheplanstoverifythat
theunitisbeinginstalledinthecorrectlocation.
4. Beforeinstallation,checktheavailablecloset
dimensionsversusthedimensionsoftheunit.
5. Notethelocationandroutingofwaterpiping,
condensatedrainpiping,andelectricalwiring.The
locationsoftheseitemsareclearlymarkedon
submittaldrawings.
6. Theinstallingcontractorwillnditbenecialto
conferwithpiping,sheetmetal,andelectrical
foremenbeforeinstallinganyunit.
Note: Check the unit data plate for correct voltage with
the plans before installing the equipment. Also,
make sure all electrical ground connections are
made in accordance with local code.
7. Thecontractorshallcovertheunitstoprotectthe
machinesduringnishingofthebuilding.Thisis
criticalwhilesprayingreproongmaterialonbar
joists,sandblasting,spraypaintingandplastering.
8. Theoverallopeningofthedoorwaytomechanical
roommustbe2"widerthantheunitforeasy
installationand/orremoval.
Table 1: Overall Unit Dimensions
Unit Size Dimensions
009 – 012 22¼"Dx20"Wx37"H
015 – 024 24¼"Dx23"Wx46½"H
030 – 036 24¼"Dx23"Wx50½"H
042 – 048 32½"Dx25"Wx46½"H
060 – 070 32½"Dx25"Wx58½"H
Note: Dimensions are approximate.

Table of Contents

Related product manuals