EasyManua.ls Logo

Daikin FTXS-L Series - Pump down Operation

Daikin FTXS-L Series
414 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pump Down Operation SiUS091133
383 Trial Operation and Field Settings
1. Pump Down Operation
Outline In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail 1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 384 for forced cooling operation.
09/12/15/18 class 24/30/36 class
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Hexagonal
wrench
(R14474)
Service port
Gas stop valve
Liquid stop valve
Valve cap
Close

Table of Contents

Other manuals for Daikin FTXS-L Series

Related product manuals