Figure 31 Connecting the power cord to the power supply
3. Attach the retention bail (strain relief) to the base of the power cable.
The retention bail prevents the power cable from pulling out of the connection.
4. Repeat steps 2 and 3 for the other power supplies.
Routing the cables using the cable management arms
Procedure
1. For SP A: route DAE power cables and back-end cables using the lower, A-side
CMA.
2. For SP B: route DAE power cables and back-end cables using the upper, B-side
CMA.
After you finish
Fully open and close the DAE to test the cable management arms and cable routing to
ensure that proper slack has been provided for the cables. Loosen any tight cables so
that removing or inserting the DAE does not pull out a cable from its port.
Installing the front bezel
Figure 32
Installing the front bezel
CL5350
Field Upgrade Procedure
38 Unity All Flash and Unity Hybrid Field Upgrade Procedure

Other manuals for Dell EMC Unity Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell EMC Unity Series and is the answer not in the manual?

Dell EMC Unity Series Specifications

General IconGeneral
BrandDell EMC
ModelUnity Series
CategoryStorage
LanguageEnglish

Related product manuals