EasyManua.ls Logo

Dell PowerStore 1000 - Power up the Node; Verify the Operation of a New 2-Port 100 Gbe Card

Dell PowerStore 1000
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 82. Installing the embedded module
2. When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever
in place.
Figure 83. Locking the release lever
3. Connect each cable into the same port from which it was removed.
Power up the node
Power up the node as described in Power control procedures.
Verify the operation of a new 2-port 100GbE card
Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you installed the card.
3. On the Components card, under Rear View, expand BaseEnclosure.
4. Expand the node that includes the card, expand EmbeddedModule, and then select 2PortCard.
The status of the replacement card should read Healthy. If the status is still Faulted, wait a few minutes and refresh
PowerStore Manager. If the status does not change, ensure that the embedded module and card are correctly seated, or
contact your service provider.
80
Base enclosure service procedures

Table of Contents

Related product manuals