Install the Storage Center Hardware
This section describes how to unpack the Storage Center equipment, prepare for the installation, mount
the equipment in a rack, and install the drives.
Unpack and Inventory the Storage Center Equipment
Unpack the storage system and identify the items in your shipment.
Figure 29. SC4020 Storage System Components
1. Documentation 2. Storage system
3. Rack rails 4. Front bezel
Prepare the Installation Environment
Make sure that the environment is ready for installing the Storage Center.
Rack Space — The rack must have enough space to accommodate the storage system chassis,
expansion enclosures, and switches.
Power — Power must be available in the rack, and the power delivery system must meet the
requirements of the Storage Center.
Connectivity — The rack must be wired for connectivity to the management network and any
networks that carry front-end I/O from the Storage Center to servers.