EasyManua.ls Logo

DISCO DAG810 - Page 51

Default Icon
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B-28
Procedures to install the power cable to the machine main body (Continued)
Step No. Procedure
7
Connect the power cable L1/L2/L3 lines to the breaker terminal block and tighten the
screws of the breaker terminal block with the specified torque (3N•m).
L1 L2 L3
8
Replace the terminal block cover back into the initial position.
9
Fasten the lock nut of the cable gland so that the power cable will not move.
Continued in the next section.

Table of Contents