User Information Ringlock Aluminium Stair Tower Erection Guidelines (4-Leg)
999817902 - 11/2020
33
Step 7
➤ AssemblethenextPlatformStairtocreatethesec-
ondlift,werecommendthisisdoneusingtwoscaf-
folders,onestandingonthetemporaryplatformand
another on the kicker lift planks.
➤ Ensure the anti-lift device is placed in the locked
position on both Planks and Platform Stairs.
Step 8
➤ AssembletheOuterGuardrailwhichwillattachto
the Rosette on the Standard.
➤ Movethetemporaryplatformfromthersttempo-
rarypositiontoanewpositionabovetherstlift.
Thetowerisnowreadytoassemblethenextlift.
Step 9
Using the temporary platform:
➤ Assemble the Ledgers and Transoms
➤ Assemble Bay Braces on all outside faces of the
bay.
Step 10
➤ AssemblethenextPlatformStairtocreatethethird
lift;werecommendthisisdoneusingtwoscaold-
ers. This Platform Stair and any other above this
will need to be maneuvered through the inside of
thetowerangledonitsside,toallowittotthrough
the spaces to the top of the tower.
➤ Ensure the anti-lift device is placed in the locked
position on both Planks and Platform Stairs.