EasyManua.ls Logo

Doosan DV11 - Reassembly; Starter

Doosan DV11
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DV11
Operation and Maintenance
108
Engine Reassembly
Printed in Mar. 2005 PS-MMA0608-E1A
Torque 4.4 kg.m
3.3.29. Starter
z Install stud bolts at the bolt holes
on the flywheel housing for
installing the starter.
z Insert the starter into the flywheel
housing and tighten the fixing nuts.
Torque 8.0 kg.m
3.3.30. Air compressor
z Assemble the piston assembly into
air compressor cylinder liner before
installing it to the flywheel housing.
(Same method as that of piston
reassembly)
z Fit a gasket to the air compressor
fitting surface of the flywheel
housing.
z Assemble the connecting rod of the
air compressor liner assembly with
the air compressor crankshaft and
tighten it to the specified torque.
z Tighten the air compressor liner
with the fixing bolts.
z Tighten the air compressor liner of
side positioned with the fixing bolt
by special tool. (“T” type socket
spanner)
z Mount gasket on the air
compressor liner.
z Tighten the air compressor head
fixing bolts to the specified torque.

Table of Contents

Related product manuals