EasyManua.ls Logo

Doosan DV11 - Page 199

Doosan DV11
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DV11
Operation and Maintenance
194
Maintenance of Major Components
Printed in Mar. 2005 PS-MMA0608-E1A
(1) Lubricating system
z Before reassembling the turbocharger onto the engine, inject new oil in the
oil inlet port and lubricate the journal and thrust bearings by rotating them
with hand.
z Clean not only the pipes installed between the engine and oil inlet port but
also the oil outlet pipe and check them for damage or foreign matters.
z Assemble each joint on oil pipes securely to prevent oil leaks.
(2) Air intake system
z Check the inside of the intake system for foreign matters.
z Assemble each joint on the intake duct and air cleaner securely to prevent
air leaks.
(3) Exhaust system
z Check the inside of the exhaust system for foreign matters.
z Be sure to use heat resisting steel bolts and nuts. Do not interchange them
with ordinary steel bolts and nuts when performing reassembly operation.
Apply anti-seizure coating to the bolts and nuts.
z Assemble each joint on the exhaust pipes securely to prevent gas leaks.

Table of Contents

Related product manuals