EasyManua.ls Logo

Dover markem-imaje SmartDate 5 - Monthly Checks

Dover markem-imaje SmartDate 5
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 3 - MAINTENANCE
3-4
SmartDate 5 06/08
3.3.2 Monthly Checks
Check condition of peel roller: Remove roller and inspect internally for wear.
Replace if necessary.
Check condition of the ribbon guide rollers: Check that bearings are smooth.
Check the condition of the shuttle rollers (SmartDate 5s).
Check condition of ribbon sensor roller. Inspect the roller coating for wear and
damage. If worn or damaged, replace the roller.
Ensure all rollers are square to the Cassette or Printer.
Check the magnet for any damage or non-alignment. This magnet is used for
ribbon detection and ribbon calibration.
Print a test image to check printhead quality and alignment. See Section 6 -
Menus.
Check condition of printhead/ shuttle carriage drive belt and associated
components: pulleys, bearings, retainers and shafts.
Check Air cylinder.

Table of Contents

Related product manuals