EasyManua.ls Logo

Dräger Narkomed 2C - High Pressure Leak

Dräger Narkomed 2C
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PMS PROCEDURE (continued) NM2C
6.13 HIGH PRESSURE LEAK
( ) 6.13.1 Oxygen High Pressure Leak
6.13.1.1 Verify the System Power switch is at STANDBY.
6.13.1.2 Open one (1) oxygen cylinder valve.
6.13.1.3 Let the pressure stabilize.
6.13.1.4 Close the oxygen cylinder valve and remove the cylinder.
6.13.1.5 Observe the oxygen cylinder pressure gauge.
6.13.1.6 After two (2) minutes, what is the pressure loss? ___ PSI (<50)
6.13.1.7 Attach the cylinder.
( ) 6.13.2 Nitrous Oxide High Pressure Leak
6.13.2.1 Turn the System Power switch to ON.
6.13.2.2 Open one (1) oxygen cylinder valve and one (1) nitrous oxide
cylinder valve.
6.13.2.3 Adjust the oxygen flow to 4 l/min.
6.13.2.4 Let the pressure stabilize.
6.13.2.5 Close the nitrous oxide cylinder valve and remove the cylinder.
6.13.2.6 Observe the nitrous oxide cylinder pressure gauge.
6.13.2.7 After two (2) minutes, what is the pressure loss? ___ PSI (<50)
6.13.2.8 Attach the cylinder.
6.13.2.9 Close the oxygen flow control valve.
Rev. K
6-28
RETURN TO CD-ROM TABLE OF CONTENTS
RETURN TO THIS MANUAL'S TABLE OF CONTENTS

Table of Contents

Related product manuals