EasyManua.ls Logo

Dräger Narkomed 2C - Page 49

Dräger Narkomed 2C
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NM2C REPLACEMENT PROCEDURES (continued)
4.5.19 Place the plexiglass cover over the gauges and flow tubes, and ensure
that the cover is fitted properly over the flow control valves.
4.5.20 Place the knob guard over the flow control valves and install its two
retaining screws.
4.5.21 Install the oxygen flow control knob and tighten its setscrews. If the
knobs are installed properly, their labels will be straight when the
knobs are against their clockwise stops.
4.5.22 Replace the front plate at the top of the plexiglass cover and secure
it with the hardware that was previously removed.
4.5.23 Replace the table top and its retaining screws.
4.5.24 Connect the pipeline hoses.
4.5.25 Perform the PMS Procedure given in Section 6.
4-19
RETURN TO CD-ROM TABLE OF CONTENTS
RETURN TO THIS MANUAL'S TABLE OF CONTENTS

Table of Contents

Related product manuals