EasyManua.ls Logo

Dru Virtuo Evolve 100 - Step-By-Step Installation Plan

Dru Virtuo Evolve 100
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
1. Step-by-step installation plan
3
Carefully read the manual before the appliance is installed.
The major points of attention of the installation are described in the check list below. Perform these steps
and tick them once they have been performed correctly. After ticking all the steps, the appliance will be ready for use.
The correct type of appliance has been supplied (table 4-1, 4-2 and 4.3)
The appliance is free from damage
All parts have been supplied (table 6-1)
A 230V 50Hz socket is present on the location where the appliance will be placed (section 6.2)
The plug of the appliance is within easy reach of the user after installation
The chimney breast meets the minimum dimensions (section 7)
The glass panes have been cleaned on the inside and outside (section 8.1.3)
The wood set, chips and glowing embers have been placed correctly (section 8.5)
The remote control has been prepared for use and works correctly (section 4 User Manual)
The appliance and remote control have been checked for proper operation
The installation has been checked in relation to operation and safety
The installation meets the requirements relating to re safety
There are no objects within the radiation range of the appliance (g. 7-1)
The total installation complies with applicable national and local building regulations
The user has been familiarised with the appliance (section 9)
Installation manual

Related product manuals