EasyManua.ls Logo

Dunkirk DCC-150 - Operating Instructions; Gas Leak Testing and Purging

Dunkirk DCC-150
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
11-1 ELECTRODES
11 - GENERAL MAINTENANCE AND CLEANING
DANGER
Before servicing, turn off electrical power to boiler at
service switch. Close manual gas valve to turn gas
supply OFF to boiler. Failure to comply will result in
death or serious injury.
!
11.4 Draining the Boiler
turn boiler off
isolate electrical supply
close boiler gas service cock
allow boiler to cool
drain boiler through onboard drain if available or
external drain valve.
11.5 Draining the Heating Circuit
Follow all steps in 11.4.
Close central heating ow and return valves.
Connect suitable pipe to drain point.
Route it to suitable container.
Open drain tap.
240011947 REV B, [03/31/2018]

Table of Contents

Other manuals for Dunkirk DCC-150

Related product manuals