EasyManua.ls Logo

Dunkirk DCC-150 - General Maintenance and Cleaning; Pre-Heating Season Maintenance

Dunkirk DCC-150
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
55
11 - GENERAL MAINTENANCE AND CLEANING
11.11 Safety Flue Thermostat -
DO NOT disable this safety
device.
Safety Flue Thermostat found on the ue inside the boiler,
interrupts ow of gas to the burner if the temperature
overheats.
After verifying the cause of the trip, press for about 2
seconds.
11.12 Flue Pressure Switch-
DO NOT disable this safety
device.
This device, positioned inside the sealed chamber, interrupts ow of
gas to the burner if ue pressure exceeds 1.6 in w.c. (4 mbar).
Verify if vent is blocked before resetting the boiler.
NOTICE
When servicing the appliance, check the condition and
position of ame sensing electrode and replace it if
necessary.
11.13 Replacement Parts
Perform Automatic Calibration procedure described as follows
if one or more of the following components are replaced.
Check and adjust CO2% value as indicated in the Combustion
Table.
Components replaced:
Primary heat exchanger
Fan
Gas valve
Gas nozzle
Burner
Flame sensing electrode
11.10 User Information
Advise and demonstrated to User the following important
information:
A. How to light and turn off boiler. How to operate
system controls.
B. Importance of annual servicing of boiler to ensure safe
and efcient operation.
C. Servicing or replacement of parts shall be carried out
by a qualied personnel.
D. Ensure boiler controls and room thermostat, if tted,
are set to User's requirements.
E. Tell User about sealed system pressure.
F. Tell User if display is active and boiler has not
operated for 24 hours for heating or hot water, the
pump will automatically operate for 5 minutes.
G. Explain to User an internal frost thermostat is tted in
boiler, and electrical supply to boiler must be left on
for thermostat to operate.
H. Show User position of pressure relief valve discharge
pipe.
I. Leave this Installation, Operation and Maintenance
Manual with User for use on future calls.
11.14 Automatic Calibration Function
Before performing this function verify there are no heat
demands in progress.
During this function ensure there is maximum heat exchange
to the system in Heating or DHW mode (DHW request) to
avoid boiler shutting off due to overheating.
Press and together and hold for about 6 seconds.
When display indicates "On" press within 3 seconds after
pressing previous buttons.
NOTICE
Important: If Calibration function does not complete
the function, press button to exit and decrease
Maximum fan speed (parameter P71) before performing
function again.
NOTICE
Important: If display indicates "303" Automatic
Calibration function has not been activated. Disconnect
boiler from main power supply for few seconds and
repeat procedure.
1.
When function is enabled, and will ash on the
display.
2.
After ignition sequence, which can also take place
after few attempts, boiler performs three operations.
Each operation lasts about 1 minute:
maximum power
ignition power
minimum power
3.
Before moving to the following phase, from maximum
power to ignition power and then to minimum power.
and appear on the display.
4.
During this phase, power level reached by boiler and
delivery temperature alternate on the display.
5.
When , and ash together on the display,
calibration function has terminated.
6.
Press to exit the function. Display will show ESC.
240011947 REV B, [03/31/2018]

Table of Contents

Other manuals for Dunkirk DCC-150

Related product manuals