INSTALLATION
EATON Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications S 164201698 Rev 1
6
Position 1
Position 6
Position 10
Position 15
First Rail
Second Rail
Figure 2. Front Rack Screw Positions
3. Secure the rail to the front of the rack with two pan-head screws
and one adapter plate. Insert the screws through positions 3 and 4
oftherail(seeFigure3).
NOTE Do not tighten the screws until the UPS or EBM is installed.