EasyManua.ls Logo

Eaton Powerware 5125 - Page 13

Eaton Powerware 5125
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications S 164201698 Rev 1
7
Assembly Wing Nuts
Front Rail Pan-Head
Screws
Position 4
Adapter
Plate
Position 3
Figure 3. Securing the Front of the Rail
4. Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 4 and Figure 5).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
7 holes above the last installed screw.
Position 2
Position 4
Position 11
Position 13
First Rail
Second Rail
Figure 4. Rear Rack Screw Positions

Other manuals for Eaton Powerware 5125

Related product manuals